Subcontractor to HMI Construction on an Index Energy project in the town of Ajax, Ontario, for the revitalization of a 17.8 MW biomass cogeneration plant.
The $16,000,000 project took 24 months and 65,000 hours to complete, and included the preparation of drawings, fabrication of piping and the complete mechanical installation of equipment supporting three turbines, such as eight cooling water towers, two 175-ton steam boilers, an electrostatic precipitator, underground cooling water supply, natural gas network, steam, condensate and more.
Fabrication and installation of racks and a 5.5 km steam and condensate network in Bécancour, supplying various plants as part of the TransCanada Energy and SNC-Lavalin cogeneration project.
Replacement of radial gate operating mechanisms at Stave Falls Dam in British Columbia.
Demolition of the roof substation at Hydro-Quebec's Beauharnois Dam.
Supply and installation of the coagulant dosing system at the Atwater and Charles-J.-Des Baillets water treatment plants in Montreal.
Mechanical and structural rehabilitation of the weighbridge
Installation of a pre-treatment system at Quebec City's organic matter recovery centre
Fabrication and installation of piping to increase capacity at the Semecs plant.
Work in a planned 11-day shutdown with 150 pipe fitters involving surveys, drawings, and installation on the Gaz CO network at Rio Tinto, Fer et Titane in Sorel-Tracy, Quebec.
Fabrication and on-site installation of an acid recovery tank complete with FRP piping network, at Rio Tinto, Fer et Titane in Sorel-Tracy, Quebec.
Replacement of the converter hood at Rio Tinto Fer Titane in Sorel-Tracy.
Replacement of a gantry crane cabin at Rio Tinto Fer Titane in Sorel-Tracy.
CONVEYOR GALLERY STRUCTURE REHABILITATION at Rio Tinto Fer Titane in Sorel-Tracy.
Repair of the silo cone at Rio Tinto Fer Titane in Sorel-Tracy.
Beam repair at Rio Tinto Fer Titane in Sorel-Tracy.
Fabrication and installation of the structure and equipment for the new Unibéton plant in Vaudreuil-Dorion for Ciment Quebec.
Fabrication and installation of the structure for Grantec's new plant in Contrecoeur, Quebec, requiring 300 tons of steel.
Mechanical installation of the new bulk material handling system at the Quebec Stevedoring Company's port facilities, including over 1,200 meters of belt conveyors, a ship loader and an ore stacker.
Mechanical installation of a debarking system at Kruger's mill in Crabtree, Quebec.
Installation of an anaerobic effluent treatment system for Tembec in Matane, Quebec.
Fabrication and installation of an underground heavy oil pipeline at Kildair in Sorel-Tracy, Quebec, totalling 8,000 ft (2.44 km) of piping.
Fabrication and installation of 22 booster stations for the Ultramar pipeline between Quebec City and Montreal.
Fabrication for Horton CBI of oil sands piping assemblies in Alberta for oil processing systems at Shell Albian Sands, Suncor Energy, Imperial Oil. Piping up to 42" diameter, occasionally requiring chrome or rubber lining. Projects requiring pre-assembly in the workshop before delivery to site.
Mechanical installation and structure of dryers at the Virentia plant in Bécancour, a company in the agri-food sector.
Installation of piping and mechanical systems for energy recovery at several Olymel plants.